- 1 Request
- 2 Layout
- 3 In Calculation
- 4 Calculated
- 5 Produced
Photopoint Wreath gold
Project name: ch, mkch, grand hotel zermatterhof, toni
Category: Special Motif Request
Articlenr
920-195
Database ID
110918
Articleno. of initial motive
622-467
Articleno. of offline reference
620-900
Infosheets
Downloads
Lights & animation
Material colors
Stock
Editors
CS CH
vesna mladenovic
Graphic AT
Nadia Kammerlander
3D Graphic AT
Johannes Knünz
Text
Specifics
- 2 Garland Ring 3m, green matt.- Incl. LEDs 2160 ww, 36V (18x 029-169) & installation
- Incl. power supply 002-018 (excl. main connector)
- Incl. gold and white decoballs & installation, B1 quality per each wreath:
Ø10cm x 40 pcs. gold glossy and matt (P02/03 + M02/03)
Ø10cm x 40 pcs. white glossy (P20)
Ø15cm x 40 pcs. gold glossy and matt (P02/03 + M02/03)
Ø15cm x 40 pcs. white glossy (P20)
- Incl. Podium with stairs powder coating MK-gold RAL1036
People will walk/stand on the podium.
- incl. Labeling on the platform with the hotel logo RAL 070 30 20
- Bow as on the Pictures in 3D Alu completely powdercoated gold RAL1036 on both wreaths but installed only on the outside
ATTENTION Motif is supplied WITHOUT weighting in the pedestal, it needs to be weighted with ca. 300kg sand bags on the inside where the wreath is.