Odabir jezika/regije
This is the first MC Arthur Glen Centre in a group of 28 centre with a new and different scheme, where modern meets the traditional kind of way. Very important to point out is that the sustainable topic was highly considered. The result was, that the total scheme and all products are Low voltage - even the 22 meter tree!
The Planning & Documentation of the Installation was done with Lumagica France and MK UK, preparation of the goods was done with the Lumagica team from Germany. Execution of Installation was done by MK UK & MK Poland and the Development did the Czech Republic team, Barcana and PM Germany!